  • Project Name: AEON2
  • Owner: AEON MALL 2
  • Address: St 1003
  • Job: concrete crack repair for swimming pool
  • Product to use: Sikadur® 31 TH and Sikadur® 52 TH
  • Quantity: 79m
  • Warranty: 1year
  • Start Date: 11/01/2018
  • End Date: 25/01/2018
  • Job: corner for swimming pool
  • Product to use: Sikadur® Combiflex® SG and Sikadur® 31 CF
  • Quantity: 75m
  • Warranty: 1year
  • Start Date: 01/02/2018
  • End Date: 06/02/2018

Between January and February of 2018, PBLCNT was contacted to analyze and determine the solution to some problems regarding the new and upcoming AEON mall on street 1003 in Sen Sok district.

PBLCNT’s technical staff was sent over to assess the problem within the new AEON swimming pool. Our first task was to fix the multiple cracks and defects that were showing throughout the swimming pool area. The initial assessment determined that the swimming pool needed the addition of Sikadur 32 TH and Sikadur 52 TH, epoxy-based injection specifically made for filling cracks and defects in concrete and other substrates. An estimated total number of over 70 meters of cracks and defects were successfully filled and fixed within the expected schedule. Furthermore, our technical staff thoroughly examine the finished filament of epoxy-based injection and concluded that all of the existing cracks and defects have been filled and fixed up to standard within the guideline of the product.

In addition, we completed the application of joint strengthening using Sikadur® Combiflex® SG and Sikadur®  31 CF. Our technical staffs successfully completed both the assessment and application ahead of the deadline within the expectation of our client.